| On the evening of October 12th, the opening ceremony of the 10th National
Sports Meeting attracted deeply each people present. However, all people
including INT’s engineers in the central power distribution room of the
Nanjing Olympic Sports Center who were responsible for the power supply
of the sports meeting were very nervous. As time passed, when presides
declared that the opening ceremony ended, everyone was relaxed.
The
10th National Sports Meeting attracted worldwide attention. We were very
proud that INT PA series integrated digital relay protection devices and
INT-SCADA integrated protection and monitor system software were used
for the very important sporting meeting and became indispensable parts
for the sports meeting’s power supply.
These words were always heard in the field command post “Each juncture
must exclude errors, and the 10th National Sports Meeting mustn’t power
off”. INT’s engineers took each detail into their considerations based
on the quality policy “seeking for great perfection”, aiming at zero failure.
For meeting special requirements of the central sports center for power
supply, INT people worked overtime and tested products over and over to
ensure zero failure. Eventually, at 11 p.m. on the evening of September
17th , INT’s products all passed the tests for the 5-channel power supply
devices held by the Department of Power Guarantee of the 10th National
Sports Meeting and were highly evaluated. Before INT’s products had been
passed more than ten tests like that.
INT people will be very proud of outstanding performances of their products
during the 10th National Sports Meeting, and will also be stimulated to
do more things and better the best. With the hope of realizing their self-values,
INT people will keep the sense of responsibility to the public in their
minds forever, which will be the foundation of INT’s stable growth.
|